Poultry feed group sees major compliance wins with PTW system
This UK based poultry feed manufacturer improved safety and efficiency with the Pisys Permit to Work system
Large Healthcare company selects Pisys PTW for Facilities Management
A large US based healthcare company adopted our Permit to Work system to assist in the facilities management at a large new-build hospital in the UK
Global Food Ingredient Producer Reduces Risk During COVID with Permit to Work system
This global food ingredient producer saw major benefits after implementing Pisys PTW during COVID
Civil Engineering Giant uses Pisys PTW to manage NHS healthcare facility
By replacing their manual permit to work system with the Pisys electronic Permit to Work system, This large UK civil engineering company were able to improve efficiency at a major new NHS healthcare facility
Petfood Manufacturer – Permit System Is A ‘Pleasure to Use’
One of the world's largest petfood manufacturers sought a replacement for its dated paper-based permit to work system, adopting Pisys PTW has brought significant benefits
Metallurgy Plant & Power Station Install Permit To Work System
Case Study: This Metallurgy Plant with its own hydro-electric Power Station required an electronic PTW system to help with communication – but all systems they saw were too complex, too expensive and too different from the paper systems they were used to. Pisys PTW delivered an easy-to-use, cost-effective and simple-to-implement...Continue reading→
Over 1000 Permits/Month Created on Fertiliser Plant Site
The whole construction project benefits from increased safety, better communication across different languages and reduced waiting times for permits to be approved.
Pisys Permit to Work in the Chocolate Tank
A renowned UK snacks manufacturer overhauled and digitised their Permit to Work (PTW) system with the assistance of Pisys PTW. Their flexibility in adapting their working practices alongside the new system paid huge dividends.
Pisys Permit to Work at Offshore Engineering Contractor
This global oil and gas engineering company uses Pisys PTW on their vessels to manage Permits to Work and Isolations while operating in the Gulf of Mexico. The software is installed on a server on board of each vessel and is accessed via the vessel’s WiFi network.
Pisys help Speedier Permit To Work Approvals in Agritech
Case Study: This agricultural technology company introduced Pisys Permit to Work software at one of their R&D Sites as part of an efficiency drive. They achieved a speedier approvals process, knowledge of where contractors were working within their site and a site-wide overview for all ongoing work on a plot...Continue reading→