Permit to work Software in Multi-Vessel offshore wind installation

Peter Henderson

26/12/2025

Offshore wind installation is one of the most complex and high-risk construction environments in operation today. It brings together multiple vessels, specialist crews, heavy lifts, marine logistics and time-critical activities,  often operating in challenging weather and sea conditions. In this context, a robust Permit to Work (PTW) system is not just a procedural requirement; it is a critical control that underpins safe coordination and execution.

When several vessels are working simultaneously on turbine installation, foundation placement, cabling or commissioning, the potential for interaction between activities increases significantly. Without a clear and structured Permit to Work process, risks can escalate quickly.

Why Multi-Vessel Operations Increase Risk

Multi-vessel offshore wind installation typically involves jack-up vessels, heavy lift vessels, cable lay vessels, crew transfer vessels and support ships operating in close proximity. Each vessel may be conducting different activities, often under separate contractors or subcontractors, but all within the same operational area.

This creates a number of challenges from a safety and coordination perspective. Activities that are safe when carried out in isolation may become hazardous when combined. Lifting operations can conflict with marine movements, electrical work may overlap with mechanical installation, and access routes can change rapidly as vessels reposition.

A Permit to Work system provides a structured way to identify these interactions and ensure that work is planned, authorised and monitored with full awareness of what else is happening at the same time.

 

The Role of Permit to Work Offshore

A Permit to Work system is designed to control high-risk activities by formally defining what work is being done, where it is taking place, how risks are being managed and who is authorised to carry it out. In offshore wind installation, this framework becomes essential for maintaining control across multiple moving parts.

Permits help ensure that hazards are assessed before work starts, that control measures are agreed and implemented, and that responsibilities are clearly assigned. They also act as a communication tool, ensuring that everyone involved understands the scope of work and the conditions under which it can proceed.

In multi-vessel environments, the permit system must go beyond individual tasks and support coordination between vessels and workstreams.

Managing Simultaneous Operations at Sea

One of the biggest challenges in offshore wind installation is managing simultaneous operations. Multiple permits may be active at the same time across different vessels, each with its own hazards and control measures.

An effective Permit to Work system allows teams to see all active permits in one place, making it easier to identify potential conflicts. For example, lifting operations on one vessel may need to be coordinated with crew transfers or cable installation activities nearby. Electrical commissioning work may require exclusion zones that affect other vessels’ movements.

By providing visibility of active and planned work, the permit system supports proactive decision-making rather than reactive intervention.

 

Vessel-Specific and Task-Specific Permits

Offshore wind installation involves a wide range of high-risk activities, each requiring tailored permit controls. These may include permits for lifting operations, work at height, electrical work, confined space entry, hot work and marine operations.

Each permit needs to reflect not only the task being carried out but also the vessel and environment in which it is taking place. Factors such as vessel stability, weather conditions, sea state and proximity to other vessels all influence risk and must be considered during permit planning and authorisation.

A flexible Permit to Work system allows permits to be adapted to different vessel types and operational scenarios without losing consistency or control.

Clear Roles and Authority Offshore

In multi-vessel operations, clarity around roles and authority is essential. There may be multiple supervisors, vessel masters, installation managers and client representatives involved in authorising work.

A Permit to Work system helps define who has the authority to approve, issue, suspend or cancel permits, and under what conditions. This reduces ambiguity and ensures that safety-critical decisions are made by the right people at the right time.

Clear handover processes are also vital, particularly when work spans shifts or when vessels change position or responsibility during an operation.

 

Adapting to Dynamic Conditions

Offshore conditions can change rapidly. Weather windows may close unexpectedly, vessels may need to reposition, or planned activities may be delayed or brought forward.

A robust Permit to Work system must support this dynamic environment. Permits may need to be suspended, amended or reauthorised as conditions change. The ability to manage these changes quickly and clearly helps prevent work continuing under unsafe conditions.

Real-time visibility of permit status across all vessels supports better coordination and faster response when plans change.

 

Communication Across Vessels and Teams

Effective communication is a cornerstone of offshore safety. In multi-vessel operations, information must flow between vessels, contractors and shore-based teams.

Permit to Work systems play an important role in this communication by providing a common framework and shared understanding of what work is authorised and under what conditions. When everyone is working from the same permit information, the risk of misunderstanding is significantly reduced.

This is particularly important during critical phases such as heavy lifts, commissioning or vessel handovers.

Digital Permit to Work in Offshore Wind Installation

Traditional paper-based permit systems struggle in offshore environments. Documents can be difficult to access, update or share across vessels, and visibility of active permits can be limited.

Digital Permit to Work systems offer clear advantages in multi-vessel offshore wind installation. They allow permits to be created, reviewed and approved electronically, with updates visible in real time. This improves coordination between vessels and supports better oversight by installation managers and HSE teams.

Digital systems also provide comprehensive audit trails, helping organisations demonstrate that work was properly authorised and controlled throughout the installation process.

 

Supporting HSE Objectives Offshore

From an HSE perspective, Permit to Work systems are a key control for managing high-risk activities offshore. They support hazard identification, risk assessment, competence checks and supervision.

In multi-vessel operations, the permit system helps ensure that safety standards are applied consistently across different contractors and vessels. This consistency is essential for maintaining control in complex, fast-moving environments.

A well-implemented Permit to Work system also supports learning and improvement by providing structured records of work activities and decisions.

 

Summary

Multi-vessel offshore wind installation presents unique challenges that demand disciplined planning, clear communication and strong control of work. Permit to Work systems play a central role in managing these challenges by providing structure, visibility and accountability across complex operations.

When designed and applied effectively, a Permit to Work system helps ensure that simultaneous activities are coordinated, risks are managed proactively and work proceeds safely , even in the most demanding offshore environments.

For organisations involved in offshore wind installation, investing in robust Permit to Work processes is not just about compliance. It is about protecting people, assets and projects in some of the world’s most challenging operational settings.